How much does your team waste in meetings that produce nothing?

Calculate the real cost of unproductive meetings. Most enterprise teams waste 60% of their meeting time before a single decision is validated.

Number of people in meetings 8
Average hourly cost per person
Meeting length
Meetings per week 5
% of meetings that feel unproductive 60%

Your team wastes this much every year:

£0
in meetings that produce no decisions
Per meeting
£0
Wasted weekly
£0
Hours wasted / year
0
Equivalent hires
0

What this means for your team:

There's a better way

What if you could solve the same problems in 5 days instead of 5 months?

The budget and time your team is burning on unproductive meetings is enough to train your entire team in the Design Sprint method — a proven framework used by Google, LEGO, and Slack to go from problem to validated solution in a single week.

The meeting loop

  • Weeks of back-and-forth with no conclusion
  • Decisions made by the loudest voice
  • Ideas discussed but never tested
  • High cost, low output
  • Team energy and morale drain

Design Sprint method

  • Structured 5-day problem-solving sprint
  • Everyone's voice heard through proven exercises
  • Real prototype tested with real users
  • Decisions made with evidence, not opinion
  • Team aligned, energised, and moving fast
Train your team in the Design Sprint method →